{"agent":"claude","input":"Set up Dependabot for this Streamlit app. Read requirements.txt, requirements-dev.txt, .pre-commit-config.yaml, app_test.py, every file under pages/, the workflow under .github/workflows and .devcontainer/devcontainer.json first, and note which packages are pinned exactly, which have only a floor and which have no version. Write .github/dependabot.yml with a weekly pip update on the root directory using the increase versioning strategy, a group that keeps the langchain packages together, a group for the development requirements and an open pull request limit; a weekly grouped github-actions update; and a monthly devcontainers update; with commit message prefixes and labels. Do not add ignore rules for packages whose update would break the imports; instead explain in the pull request which pages and which test will fail on the first such update and why that is the intended signal. In the sandbox install both requirements files on Python 3.11, run pytest app_test.py to record the passing baseline, and validate the Dependabot configuration file. Open a pull request with the pin inventory, the baseline test output and what each update group will touch.","resources":[{"url":"https://github.com/your-org/your-app"}]}